Onsite Working Student – Building Services (TGA), Lean Construction, Scheduling

Posted last week

Apply now

About the role

  • Werkstudent supporting Lean Construction and scheduling for TGA projects at ROM Technik. Assisting in workshops, planning, and process optimization with a focus on practical insights.

Responsibilities

  • Join the ROM Technik team at our Stuttgart location as soon as possible
  • Support the introduction, implementation and further development of our "LEAN ROM P4" strategy — Lean management for the planning and execution phases of TGA projects
  • Prepare and follow up on workshops and training sessions and assist with moderation — both internally and externally
  • Provide committed support for efficient scheduling and schedule control as well as for the execution of construction measures using project management tools: MS Project, visual task management and regular project communication
  • Use your academic knowledge to support the continuous improvement process (CIP)
  • Visualize process analyses, concepts and construction sequencing/scheduling

Requirements

  • You are currently enrolled in a Bachelor's or Master's program in Civil Engineering, Real Estate Management or a related field
  • Ideally, you already have practical experience in building services engineering and are familiar with Lean Construction and scheduling
  • You are confident using common MS Office programs, especially Excel and PowerPoint
  • Many hands work on our projects — you bring team spirit and a high level of commitment

Benefits

  • An interesting and varied role within a structured and motivated team
  • You will be fairly compensated for your work
  • Gain comprehensive insight into all trades of technical building services from both a planning and practical perspective
  • Assignment period of at least 6 months (or longer)
  • After graduation, there is the possibility to start your career as a Project Manager

Job title

Working Student – Building Services (TGA), Lean Construction, Scheduling

Job type

Experience level

Entry level

Salary

Not specified

Degree requirement

Bachelor's Degree

Location requirements

Report this job

See something inaccurate? Let us know and we'll update the listing.

Report job